Skip to content
Octo × Environment PT Request an assessment

Octo for the port environment

Environmental performance is measured. Octo helps organize the evidence.

ANTAQ's Environmental Performance Index (IDA) is currently established by ANTAQ Resolution 123 of December 17, 2024, which revoked Resolution 2.650/2012; ANTAQ describes the indicators weighted by the AHP method. Law 12.305/2010 subjects those responsible for terminals to the solid waste management plan, and the IMO publishes consolidated guidance for providers and users of ship waste reception facilities. Octo can help your team gather and keep current the evidence each requirement calls for.

The IDA indicators, the PGRS and ship waste records go into Octo, which returns the evidence per indicator and the outstanding items for the team. INPUT IDA INDICATORS PGRS SHIP WASTE EVIDENCE PER INDICATOR OUTSTANDING FOR THE TEAM indicator → evidence → date OCTO × PORTS ENVIRONMENT GP-08
IDA38 indicatorsin 4 categories, accessed October 28, 2026
MethodAHPAnalytic Hierarchy Process
PGRSLaw 12.305/2010arts. 20, IV, and 21
Sources6listed at the end of the page
01

What Octo does for the environment.

Four possible deliverables. Technical responsibility remains with the environmental team.

Evidence per indicator

Can build the list of IDA indicators with the evidence your team keeps for each one, where it is and when it was updated.

Deliverable: evidence table per indicator

PGRS with the minimum content

Can organize the waste assessment, with origin, volume and characterization, and check whether the plan covers the minimum content of art. 21 of Law 12.305/2010.

Deliverable: minimum content checklist with what is missing

Reception of ship waste

Can organize ship waste reception records in light of the IMO's consolidated guidance for providers and users.

Deliverable: organized record for review

Changes tracked

Can follow the IDA structure and indicators page and alert the team when it changes.

Deliverable: notice of what changed
02

Eight arms, one evidence table.

The same Octo cycle, applied to this topic. Each arm has a narrow role; the people who approve and sign are on your team.

  1. Discovery

    Lists the requirements

    Which IDA indicators, which PGRS items and which waste records apply to your facility.

  2. Data

    Links requirement and evidence

    Each requirement linked to the document that proves it, with location and date.

  3. Security

    Respects the document

    Licenses and technical reports belong to the company. Octo works only in the approved environment.

  4. Architecture

    Picks the format

    Spreadsheet, database or organized folder, matching how the team already works.

  5. Development

    Builds the table

    Requirements, evidence, dates and outstanding items.

  6. Review

    Checks with the person in charge

    The professional of record reviews the table before it counts.

  7. Release

    Delivers with your OK

    The table goes wherever the team says.

  8. Documentation

    Records the version

    Which version of the IDA structure and the IMO guidance was used.

Octo does not sign environmental plans or answer for the index. The professional of record and the environmental team remain in charge.

03

Each requirement, its basis.

Environmental requirements with a published source. The official text remains the reference.

RequirementBasisWhat it requires
Environmental Performance IndexANTAQ Resolution 123/2024, of December 17, 2024Establishes the IDA; Resolution 2.650/2012 is revoked
IDA structureANTAQ, structure and indicators38 indicators, 4 categories and 14 global indicators (accessed October 28, 2026)
Terminal PGRSLaw 12.305/2010, art. 20, IVThose responsible for terminals are subject to the plan
Minimum PGRS contentLaw 12.305/2010, art. 21Assessment with origin, volume and characterization of the waste
Reception of ship wasteIMO, MEPC.1/Circ.834/Rev.1Consolidated guidance for providers and users
04

From request to routine.

Three steps. Each one only makes sense once the previous one has shown results on your team.

A proposal, not a promise

1 Today

Evidence table

Octo builds the table of requirements with the evidence the team already has.

  • Evidence per indicator
  • Outstanding items listed
Benefit: the team sees what is missing
2 Next

PGRS checked

The plan is now checked against the law's minimum content.

  • Organized assessment
  • List of what is missing from the plan
Benefit: the plan covers what the law requires
3 Later

Monitoring

Changes to the IDA structure and the IMO guidance are now flagged.

  • Notice of what changed
  • Table kept current
Benefit: the evidence does not go stale
05

Confirmed by source.

Each point below has a source published by the agency responsible for the standard or the system, or by the IMO. The sources are in the next section.

6

points with a published source, each with its reference alongside.

ConfirmedIDA: the rule in force
ANTAQ Resolution 123, signed on December 17, 2024 and published on December 18, 2024, establishes the Environmental Performance Index (IDA) as ANTAQ's instrument to monitor and evaluate the environmental management of public ports and port facilities. ANTAQ marks Resolution 2.650/2012, which previously established the index, as revoked by 123/2024.Source: ANTAQ, Sophia collection (Resolution 123/2024) and guide to vessel waste reception
ConfirmedMethod
The IDA page at ANTAQ describes the AHP (Analytic Hierarchy Process) methodology for weighting the indicators.Source: ANTAQ, Environmental Performance Index
ConfirmedIDA structure
The 38 indicators that make up the IDA are classified into 4 categories and 14 global indicators (accessed October 28, 2026); among them is the terminals' PGRS.Source: ANTAQ, IDA structure and indicators
ConfirmedTerminals and the PGRS
Law 12.305/2010 requires those responsible for terminals and other facilities referred to in the law to prepare a solid waste management plan.Source: Chamber of Deputies, Law 12.305/2010, art. 20, IV, original publication
ConfirmedMinimum content
The plan includes, among other items, an assessment of the solid waste generated or managed, with its origin, volume and characterization.Source: Chamber of Deputies, Law 12.305/2010, art. 21, original publication
ConfirmedShip waste
The IMO publishes the revised consolidated guidance for providers and users of port reception facilities, MEPC.1/Circ.834/Rev.1.Source: IMO, Port reception facilities
06

What Octo does and what stays with you.

Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.

Octo prepares

Gathers, calculates, organizes and produces the documents: spreadsheets, reports, dashboards and drafts.

Deliverable: material ready for review

Your team reviews

The licensed professional reviews what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.

Step: review by whoever signs

Who signs

Octo does not sign. Designs, technical reports, ART/RRT, accountability reports and any official document are still signed by the licensed professional at the company or agency: here, the professional of record and the port authority.

Signature: professional of record and port authority
07

Sources.

ANTAQ pages on the IDA and Resolution 123/2024, Law 12.305/2010 at the Chamber of Deputies and the IMO page on reception facilities. Accessed October 28, 2026 and October 31, 2026.

The right evidence in the right place.

The assessment starts with the environmental documents your team already has, without changing anything. You get a proposal for what can be organized and decide with it in hand.