Octo prepares
Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.
Deliverable: material ready to checkOcto × Construction · research of October 28, 2026
Eight construction workstreams, one question: what can be automated, and where can an AI team help? Each page shows what Octo can do, by which path, and what is confirmed by an official source: vendor, open project, ISO, ABNT, Caixa or Planalto.
One arm per workstream
A task from request to approval, at a fictional company. The arms measure, plan and execute; the person in charge checks and approves. Each tab is a workstream in this field and links to its page.
Workstream pageCost estimating →Coordination →
With the software and standards for each workstream, how they are automated, where Octo can help and what is confirmed by a published source.
Add-ins through the Revit API to export IFC, PDF and DWG with the same rule, and the cloud route through the Revit Automation API.
Open the page →Clash Detective, XML and HTML reports, batch conversion with the Batch Utility and the .NET API for coordinating disciplines.
Open the page →The headless Core Console, .scr scripts, -PLOT, -PUBLISH and EXPORT to issue sheets in batch, and custom .NET commands.
Open the page →ISO 16739-1, BCF and IDS from buildingSMART, and the open IfcOpenShell tools to validate, convert and check models.
Open the page →What each part of ISO 19650 and NBR 15575 covers and its status in the ABNT catalog, without reproducing the text of the standards.
Open the page →Caixa's monthly reports, cost compositions and inputs, and the reference estimate under Decree 7.983/2013. No prices.
Open the page →Which agencies and which projects Decree 10.306/2020 covers, in three phases, the BIM BR Strategy under Decree 11.888/2024 and the preference for BIM in Law 14.133/2021.
Open the page →Navisworks TimeLiner, Project and Primavera schedules, IfcOpenShell and the site inspector's log under Law 14.133/2021.
Open the page →Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.
Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.
Deliverable: material ready to checkThe licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.
Step: review by the signerOcto does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.
Sign-off: engineer or architect, with ART/RRTThe assessment starts by reading what you already have, without changing anything. You get a map of what can be automated and decide with it in hand.