List of project standards
From the ABNT catalog, it can build the list of parts that apply to your project, with the edition and status of each, for the team to check.
Deliverable: list of standards with edition, status and linkOcto and the standards
The ISO 19650 series covers information management using BIM, and ABNT publishes its parts in Brazil. ABNT NBR 15575 covers the performance of residential buildings. The standards are paid, and their text is not reproduced here: this page shows what each part covers, its catalog status and where Octo can help your team meet what it has already defined.
Four possible deliverables. Octo organizes; interpreting the standard is up to the professional of record.
From the ABNT catalog, it can build the list of parts that apply to your project, with the edition and status of each, for the team to check.
Deliverable: list of standards with edition, status and linkPart 1 of ISO 19650 recommends an information management structure: exchange, recording, versioning and organization. Octo can automate the registers and versioning your team has already defined.
Deliverable: register routine that follows your procedureWith the NBR 15575 text your company owns, it can organize checklists by system (structure, floors, walls, roofs, plumbing) for the team to fill in.
Deliverable: checklists to fill in and reviewIt can check the ABNT catalog from time to time and flag when a part used in the project changes edition or status.
Deliverable: alert with the catalog linkThe same Octo cycle, applied to this workstream. Each arm has a narrow role; the people who approve and sign are on your team.
Procedures, document templates and the standards the company already owns. Octo starts from what your team has defined.
For each standard, the edition, the date and the status in the ABNT catalog, with the link.
A purchased standard is for the company's use. Octo does not reproduce the text outside the client's environment.
Spreadsheet, checklist or routine in the system the team already uses.
Lists, registers and alerts, with the reference for each item.
Each list goes through the professional of record before it is used.
Puts the lists and routines in the environment the team specifies.
Which part applies to each project, in which edition, and why.
Octo does not certify compliance with standards. Interpretation and technical responsibility belong to the licensed professionals.
Edition and status per the ISO committee catalog and the ABNT catalog, accessed on October 28, 2026.
| Standard | What it covers | Status |
|---|---|---|
| ISO 19650-1:2018 | Concepts and principles | ABNT NBR ISO 19650-1:2022, Corrected Version 2:2025, in force |
| ISO 19650-2:2018 | Delivery phase of the assets | ABNT NBR ISO 19650-2:2022, Corrected Version 2:2025, in force |
| ISO 19650-3:2020 | Operational phase of the assets | ABNT NBR ISO 19650-3:2025, published October 7, 2025, in force |
| ISO 19650-4:2022 | Information exchange | 2025 Brazilian edition in the ABNT catalog |
| ISO 19650-5:2020 | Security | 2025 Brazilian edition in the ABNT catalog |
| ISO 19650-6:2025 | Health and safety | 2026 Brazilian edition in the ABNT catalog |
| ABNT NBR 15575-1:2025 | General requirements | Published December 5, 2025, in force |
| ABNT NBR 15575-2:2013 | Structural systems | In force |
| ABNT NBR 15575-3 | Floor systems | In force |
| ABNT NBR 15575-4:2025 | Internal and external vertical enclosures (SVVIE) | In force |
| ABNT NBR 15575-5:2025 | Roof systems | In force |
| ABNT NBR 15575-6:2021 | Plumbing and drainage systems | In force |
Three steps. Each one only makes sense after the previous one has shown results on your team.
A proposal, not a promise
You name the project and Octo builds the list with edition and status.
Starting from the text the company owns, the checklists become the same on every project.
Information registers and versions follow the company's procedure, with an alert when an edition changes.
Every point below has a source published by the vendor, the project or the responsible agency. The sources are in the next section.
5
points with a published source, each with its reference alongside.
Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.
Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.
Deliverable: material ready to checkThe licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.
Step: review by the signerOcto does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.
Sign-off: engineer or architect, with ART/RRTISO committee catalog and ABNT catalog. Accessed on October 28, 2026.
The assessment starts with the procedures and standards your company already has, without changing anything. You get a proposal for what can be organized and decide with it in hand.