Monthly database
It can read the month's XLSX reports (inputs, compositions, families and coefficients, maintenance updates) and build a database the team can look things up in.
Deliverable: monthly database with the origin of every numberOcto for cost estimating with SINAPI
SINAPI is Brazil's main cost reference for construction and engineering services, maintained by Caixa (the federal savings bank) and IBGE (the national statistics institute). Every month Caixa publishes the reports as spreadsheets and PDFs. Octo can read these reports, cross-check them against your team's estimate and point out what changed, always for the estimator to review.
Four possible deliverables. None of them sets prices: all start from the published reports and go to the estimator.
It can read the month's XLSX reports (inputs, compositions, families and coefficients, maintenance updates) and build a database the team can look things up in.
Deliverable: monthly database with the origin of every numberIt can cross-check the composition codes in your estimate against the month's reports and list what changed.
Deliverable: list of differences for the estimatorIt can break each composition down into inputs and auxiliary compositions, with the coefficients, as SINAPI defines them, and point to the matching Technical Booklet.
Deliverable: detailed composition with the referenceIt can compare the estimate's unit costs with the SINAPI median, the Decree 7.983/2013 rule for projects funded by the federal government, and flag what exceeds it.
Deliverable: list for the estimator to analyzeThe same Octo cycle, applied to this workstream. Each arm has a narrow role; the people who approve and sign are on your team.
Which program or spreadsheet holds the estimate, which codes it uses, and which month and state the reference is from.
Every SINAPI number applies to one month and one Brazilian state. Without that on record, the comparison doesn't add up.
The estimate belongs to the client and may be confidential in a bid. Octo works only in the environment the team gives it access to.
Caixa's XLSX reports for the database, a spreadsheet or script for the cross-check, PDF for reference only.
A script that reads the month's reports and the estimate, with the origin of every number noted.
Compares with compositions the estimator has already checked by hand.
With your OK, it leaves the list of differences in the estimate folder.
Month, state and Caixa files used in each estimate.
Octo does not sign estimates. Responsibility for the reference estimate lies with the professional who prepares it.
The criteria Octo uses to choose. The tool your team already uses remains the reference.
| Task | Path | Note |
|---|---|---|
| Monthly database | Caixa's XLSX reports | Inputs and compositions for every state |
| Detail of a composition | Analytical report and Technical Booklet | Inputs and auxiliary compositions, with coefficients |
| Project funded by the federal government | Decree 7.983/2013 | Unit cost up to the SINAPI median |
| Transportation infrastructure | SICRO, from DNIT | Its own reference, separate from SINAPI |
| Estimated value in a bid | Law 14.133/2021, art. 23, § 2 | SINAPI median, or SICRO for transportation |
Three steps. Each one only makes sense after the previous one has shown results on your team.
A proposal, not a promise
You send the estimate and the month, and Octo returns the list of differences.
With each Caixa release, the database is updated and the estimates in progress are cross-checked.
Quantities extracted from the model can be linked to the compositions.
Every point below has a source published by the vendor, the project or the responsible agency. The sources are in the next section.
6
points with a published source, each with its reference alongside.
Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.
Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.
Deliverable: material ready to checkThe licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.
Step: review by the signerOcto does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.
Sign-off: engineer or architect, with ART/RRTCaixa and federal legislation published on the Planalto website. Accessed on October 28, 2026.
The assessment starts with an estimate your team has already closed, without changing anything. You get a proposal for what can be checked every month and decide with it in hand.