Skip to content
Octo × Cost estimating PT Request an assessment

Octo for cost estimating with SINAPI

The table changes every month. So can the check.

SINAPI is Brazil's main cost reference for construction and engineering services, maintained by Caixa (the federal savings bank) and IBGE (the national statistics institute). Every month Caixa publishes the reports as spreadsheets and PDFs. Octo can read these reports, cross-check them against your team's estimate and point out what changed, always for the estimator to review.

SINAPI's monthly reports, the cost compositions and the estimate go into Octo, which returns the month's differences and the detailed composition. INPUT .XLSX REPORTS COMPOSITIONS ESTIMATE DIFFERENCES THIS MONTH COMPOSITION IN DETAIL check estimate.xlsx against this month's reports OCTO × CONSTRUCTION ESTIMATE CC-06
Maintained byCaixa and IBGEas required by Decree 7.983/2013
ReportsMonthlyin two ZIP files: XLSX and PDF
Law 14.133/2021Art. 23SINAPI in the estimated value of projects
Sources4listed at the end of the page
01

What Octo does in cost estimating.

Four possible deliverables. None of them sets prices: all start from the published reports and go to the estimator.

Monthly database

It can read the month's XLSX reports (inputs, compositions, families and coefficients, maintenance updates) and build a database the team can look things up in.

Deliverable: monthly database with the origin of every number

Estimate check

It can cross-check the composition codes in your estimate against the month's reports and list what changed.

Deliverable: list of differences for the estimator

Composition breakdown

It can break each composition down into inputs and auxiliary compositions, with the coefficients, as SINAPI defines them, and point to the matching Technical Booklet.

Deliverable: detailed composition with the reference

Median benchmark

It can compare the estimate's unit costs with the SINAPI median, the Decree 7.983/2013 rule for projects funded by the federal government, and flag what exceeds it.

Deliverable: list for the estimator to analyze
02

Eight arms, one estimate.

The same Octo cycle, applied to this workstream. Each arm has a narrow role; the people who approve and sign are on your team.

  1. Discovery

    Understands the estimate

    Which program or spreadsheet holds the estimate, which codes it uses, and which month and state the reference is from.

  2. Data

    Pins down month and state

    Every SINAPI number applies to one month and one Brazilian state. Without that on record, the comparison doesn't add up.

  3. Security

    Respects the estimate

    The estimate belongs to the client and may be confidential in a bid. Octo works only in the environment the team gives it access to.

  4. Architecture

    Picks the path

    Caixa's XLSX reports for the database, a spreadsheet or script for the cross-check, PDF for reference only.

  5. Development

    Writes the cross-check

    A script that reads the month's reports and the estimate, with the origin of every number noted.

  6. Review

    Checks against a known item

    Compares with compositions the estimator has already checked by hand.

  7. Release

    Delivers the list

    With your OK, it leaves the list of differences in the estimate folder.

  8. Documentation

    Records the reference

    Month, state and Caixa files used in each estimate.

Octo does not sign estimates. Responsibility for the reference estimate lies with the professional who prepares it.

03

Each task, its own path.

The criteria Octo uses to choose. The tool your team already uses remains the reference.

TaskPathNote
Monthly databaseCaixa's XLSX reportsInputs and compositions for every state
Detail of a compositionAnalytical report and Technical BookletInputs and auxiliary compositions, with coefficients
Project funded by the federal governmentDecree 7.983/2013Unit cost up to the SINAPI median
Transportation infrastructureSICRO, from DNITIts own reference, separate from SINAPI
Estimated value in a bidLaw 14.133/2021, art. 23, § 2SINAPI median, or SICRO for transportation
04

From request to routine.

Three steps. Each one only makes sense after the previous one has shown results on your team.

A proposal, not a promise

1 Today

On-demand checks

You send the estimate and the month, and Octo returns the list of differences.

  • Monthly database built from Caixa's reports
  • Cross-check by composition code
  • Compositions broken down when needed
Benefit: the review starts with what changed
2 Next

Monthly routine

With each Caixa release, the database is updated and the estimates in progress are cross-checked.

  • Database updated every month
  • A list for each estimate in progress
Benefit: no estimate keeps an outdated reference without the team knowing
3 Later

From model to estimate

Quantities extracted from the model can be linked to the compositions.

  • Quantities traced back to the model
  • Compositions chosen by the estimator
Benefit: the estimate keeps up with design changes
05

Confirmed by sources.

Every point below has a source published by the vendor, the project or the responsible agency. The sources are in the next section.

6

points with a published source, each with its reference alongside.

ConfirmedWhat SINAPI is
The National System of Construction Cost and Index Surveys (Sistema Nacional de Pesquisa de Custos e Índices da Construção Civil): Brazil's main cost reference for construction and engineering services, as required by Decree 7.983/2013, maintained jointly by Caixa and IBGE.Source: Caixa, SINAPI page
ConfirmedPublished methodology
The methodology is in two books, “Metodologias e Conceitos” (Methodologies and Concepts, 11th edition, March 2026) and “Cálculos e Parâmetros” (Calculations and Parameters). Caixa maintains the Technical Booklets of Service Compositions and the Technical Specification Sheets for Inputs; since 2022 there have been parametric compositions.Source: Caixa, SINAPI page and methodology book
ConfirmedMonthly reports
They come in two ZIP files: XLSX (families and coefficients, maintenance updates, labor percentage, inputs and compositions for every state) and PDF (composition breakdowns, composition costs and input prices). Until 2024, they were published by state.Source: Caixa, SINAPI page
ConfirmedComposition and price
A service composition is the set of inputs and auxiliary compositions needed to perform one unit of the service. To generate monthly prices for every state, IBGE uses the homogeneous input family methodology.Source: Caixa, Metodologias e Conceitos book
ConfirmedDecree 7.983/2013
Sets the rules for the reference estimate of construction and engineering services funded by the federal government: unit costs less than or equal to the SINAPI median. For transportation infrastructure, the reference is SICRO, maintained by DNIT.Source: Planalto, Decree 7.983/2013
ConfirmedLaw 14.133/2021
Under art. 23, § 2, the estimated value of construction and engineering services relies first on unit cost compositions up to the SINAPI median, or the SICRO median for transportation infrastructure.Source: Planalto, Law 14.133/2021
06

What Octo does and what stays with you.

Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.

Octo prepares

Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.

Deliverable: material ready to check

Your team checks

The licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.

Step: review by the signer

Who signs

Octo does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.

Sign-off: engineer or architect, with ART/RRT
07

Sources.

Caixa and federal legislation published on the Planalto website. Accessed on October 28, 2026.

The estimate checked with every release.

The assessment starts with an estimate your team has already closed, without changing anything. You get a proposal for what can be checked every month and decide with it in hand.