Schedule linked to the model
It can prepare the schedule import (Microsoft Project, Primavera, Asta or CSV) into TimeLiner and the rule that links each task to the model objects.
Deliverable: link rule and list of what was left unlinkedOcto for construction planning and records
Navisworks TimeLiner imports schedules and links tasks to model objects to simulate construction and compare planned against actual. Octo can prepare these links, check the imported schedule and organize the construction records for your team.
Four possible deliverables. Planning and the official log stay with whoever the project and the contract designate.
It can prepare the schedule import (Microsoft Project, Primavera, Asta or CSV) into TimeLiner and the rule that links each task to the model objects.
Deliverable: link rule and list of what was left unlinkedWith actual dates recorded, it can build the planned-versus-actual comparison and list the tasks off schedule for the site meeting.
Deliverable: list of tasks off scheduleWith IfcOpenShell, it can work on schedules, critical path and sequence animation from the IFC.
Deliverable: proposal for the team to evaluateIt can organize construction notes by date, location and subject, in the format the inspection and the team define.
Deliverable: searchable logThe same Octo cycle, applied to this workstream. Each arm has a narrow role; the people who approve and sign are on your team.
Which program holds the schedule, which Navisworks edition the team has and how the model is split up.
Which code or property links each task to each object. Without that rule in writing, the simulation can't be repeated.
The schedule and the records belong to the client and the contract. Octo works in the approved environment.
TimeLiner when the team already uses Navisworks; IfcOpenShell when the work starts from IFC.
Import, links and report, with the rule written down.
Compares with a part of the project whose progress the team knows.
Leaves the simulation and the lists in the project folder.
Schedule and model versions used in each simulation.
Octo does not replace the inspector or the person responsible for the project. The official log is kept by whoever the contract and the law designate.
The criteria Octo uses to choose. The tool your team already uses remains the reference.
| Task | Path | Note |
|---|---|---|
| Simulation linked to the schedule | Navisworks TimeLiner | In Manage and Simulate |
| Import the schedule | Microsoft Project (2007 to 2013, MPX), Primavera P6, Asta Power Project, CSV | Per the Navisworks help |
| Planned × actual | Actual dates in TimeLiner | Costs can also be assigned to tasks |
| Schedule and sequencing on IFC | IfcOpenShell | Critical path and sequence animation |
| Construction log on a public contract | The inspector's own log | Law 14.133/2021, art. 117 |
Three steps. Each one only makes sense after the previous one has shown results on your team.
A proposal, not a promise
You send the schedule and the model, and Octo prepares the import and the links.
With actual dates, planned and actual are compared every week.
The as-built model and the construction log move forward together.
Every point below has a source published by the vendor, the project or the responsible agency. The sources are in the next section.
5
points with a published source, each with its reference alongside.
Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.
Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.
Deliverable: material ready to checkThe licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.
Step: review by the signerOcto does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.
Sign-off: engineer or architect, with ART/RRTAutodesk and IfcOpenShell documentation and federal legislation published on the Planalto website. Accessed on October 28, 2026.
The assessment starts with a schedule and a model your team already has, without changing anything. You get a proposal for what can be linked and tracked and decide with it in hand.