Octo for construction planning and records

The schedule linked to the model, and the log up to date.

Navisworks TimeLiner imports schedules and links tasks to model objects to simulate construction and compare planned against actual. Octo can prepare these links, check the imported schedule and organize the construction records for your team.

The schedule, the model and the actual dates go into Octo, which returns the simulation linked to the schedule and the planned-versus-actual comparison. INPUT SCHEDULE MODEL ACTUAL DATES SIMULATION LINKED TO SCHEDULE PLANNED × ACTUAL TimeLiner: tasks linked to model objects OCTO × CONSTRUCTION PLANNING CC-08
TimeLinerManage and SimulateNavisworks editions with the feature
SchedulesProject, P6, CSVand Asta Power Project
Law 14.133/2021Art. 117the inspector records events in a dedicated log
Sources5listed at the end of the page
01

What Octo does in planning.

Four possible deliverables. Planning and the official log stay with whoever the project and the contract designate.

Schedule linked to the model

It can prepare the schedule import (Microsoft Project, Primavera, Asta or CSV) into TimeLiner and the rule that links each task to the model objects.

Deliverable: link rule and list of what was left unlinked

Planned × actual

With actual dates recorded, it can build the planned-versus-actual comparison and list the tasks off schedule for the site meeting.

Deliverable: list of tasks off schedule

Sequencing on IFC

With IfcOpenShell, it can work on schedules, critical path and sequence animation from the IFC.

Deliverable: proposal for the team to evaluate

Organized log

It can organize construction notes by date, location and subject, in the format the inspection and the team define.

Deliverable: searchable log
02

Eight arms, one project under way.

The same Octo cycle, applied to this workstream. Each arm has a narrow role; the people who approve and sign are on your team.

  1. Discovery

    Identifies schedule and model

    Which program holds the schedule, which Navisworks edition the team has and how the model is split up.

  2. Data

    Sets the link rule

    Which code or property links each task to each object. Without that rule in writing, the simulation can't be repeated.

  3. Security

    Respects the project

    The schedule and the records belong to the client and the contract. Octo works in the approved environment.

  4. Architecture

    Picks the path

    TimeLiner when the team already uses Navisworks; IfcOpenShell when the work starts from IFC.

  5. Development

    Builds the routine

    Import, links and report, with the rule written down.

  6. Review

    Checks on a known stretch

    Compares with a part of the project whose progress the team knows.

  7. Release

    Delivers with your OK

    Leaves the simulation and the lists in the project folder.

  8. Documentation

    Records each update

    Schedule and model versions used in each simulation.

Octo does not replace the inspector or the person responsible for the project. The official log is kept by whoever the contract and the law designate.

03

Each task, its own path.

The criteria Octo uses to choose. The tool your team already uses remains the reference.

TaskPathNote
Simulation linked to the scheduleNavisworks TimeLinerIn Manage and Simulate
Import the scheduleMicrosoft Project (2007 to 2013, MPX), Primavera P6, Asta Power Project, CSVPer the Navisworks help
Planned × actualActual dates in TimeLinerCosts can also be assigned to tasks
Schedule and sequencing on IFCIfcOpenShellCritical path and sequence animation
Construction log on a public contractThe inspector's own logLaw 14.133/2021, art. 117
04

From request to routine.

Three steps. Each one only makes sense after the previous one has shown results on your team.

A proposal, not a promise

1 Today

On-demand linking

You send the schedule and the model, and Octo prepares the import and the links.

  • Written link rule
  • List of tasks with no object and objects with no task
Benefit: the simulation comes out complete on the first run
2 Next

Weekly tracking

With actual dates, planned and actual are compared every week.

  • List of tasks off schedule
  • Organized construction log
Benefit: the site meeting starts with what's late
3 Later

Project recorded in the model

The as-built model and the construction log move forward together.

  • Log of changes in the model
  • Searchable construction history
Benefit: the finished project comes with a documented history
05

Confirmed by sources.

Every point below has a source published by the vendor, the project or the responsible agency. The sources are in the next section.

5

points with a published source, each with its reference alongside.

ConfirmedTimeLiner
Imports schedules from several sources and links tasks to model objects to create a simulation; compares planned against actual and can assign costs to tasks. It is available in Navisworks Manage and Simulate.Source: Navisworks 2024, TimeLiner
ConfirmedSchedule sources
Microsoft Project (2007 to 2013 and MPX), Primavera (P6 and web services), Asta Power Project and CSV.Source: Navisworks 2021, help (in Spanish)
ConfirmedThe inspector's log
Under Law 14.133/2021, contract execution is monitored by designated inspectors, and the inspector records in a dedicated log every event related to the execution of the contract.Source: Planalto, Law 14.133/2021, art. 117
ConfirmedBIM in construction control
Since January 1, 2024, in phase 2 of Decree 10.306/2020, the agencies the decree binds (the Ministry of Defense and the Ministry of Infrastructure, for the projects listed in art. 2) must also use BIM for construction planning and control and for updating the as-built model, on the projects they deem highly relevant.Source: Planalto, Decree 10.306/2020, arts. 2 and 4, II
ConfirmedIfcOpenShell
The documentation lists creating construction schedules, critical path analysis and sequence animation among the library's capabilities.Source: IfcOpenShell documentation
06

What Octo does and what stays with you.

Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.

Octo prepares

Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.

Deliverable: material ready to check

Your team checks

The licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.

Step: review by the signer

Who signs

Octo does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.

Sign-off: engineer or architect, with ART/RRT
07

Sources.

Autodesk and IfcOpenShell documentation and federal legislation published on the Planalto website. Accessed on October 28, 2026.

The schedule and the site speaking the same language.

The assessment starts with a schedule and a model your team already has, without changing anything. You get a proposal for what can be linked and tracked and decide with it in hand.