Octo and BIM in public works

In federal projects, BIM arrives agency by agency, phase by phase.

Decree 10.306/2020 requires BIM from the Ministry of Defense, for Army, Navy and Air Force properties, and from the Ministry of Infrastructure, for regional airports and for DNIT's special structures (bridges, viaducts and tunnels). It applies in three phases and only to the projects each agency deems relevant for spreading BIM; other federal agencies may adopt it. The BIM BR Strategy now sits in Decree 11.888/2024, and Law 14.133/2021 gives BIM preference in bids for construction and engineering services whenever it suits the scope. Octo can help your team put together the deliverables each phase calls for.

The bid notice, Decree 10.306/2020 and the model go into Octo, which returns the deliverables for each phase and the clash reports. INPUT BID NOTICE DECREE 10.306 MODEL DELIVERABLES BY PHASE REPORTS CLASHES deliverables: clashes, quantities, documentation OCTO × CONSTRUCTION PROCUREMENT CC-07
Phase 12021design of highly relevant projects
Phase 22024also the management of highly relevant projects
Phase 32028projects of medium or high relevance
Sources4listed at the end of the page
01

What Octo does for the deliverables.

Four possible deliverables, tied to the BIM uses Decree 10.306/2020 lists for each phase.

Clash detection

Phase 1 calls for detecting physical and functional clashes between disciplines. Octo can prepare and organize the clash tests in Navisworks or IfcClash.

Deliverable: clash report by discipline

Quantities from the model

Phase 1 includes quantity takeoff. Octo can extract quantities from the model with a script and link them to the cost estimate.

Deliverable: quantity spreadsheet with its origin

Drawing documentation

It can generate and check drawing sheets from the model, in batch, in Revit or AutoCAD.

Deliverable: sheet set with a log

Planning and as-built

Phase 2 adds cost estimating, construction planning and control, and updating the model as built. Octo can organize the link between the schedule and the model and the log of changes.

Deliverable: proposed routine for the team
02

Eight arms, one contract.

The same Octo cycle, applied to this workstream. Each arm has a narrow role; the people who approve and sign are on your team.

  1. Discovery

    Reads the bid notice

    Which BIM uses the contract requires, whether the client and the project fall under Decree 10.306/2020, and in which phase.

  2. Data

    Lists the deliverables

    Each required use becomes a deliverable with a format, a deadline and an owner.

  3. Security

    Respects the contract

    Contract models and documents belong to the client and the contractor. Octo works only in the environment it is given access to.

  4. Architecture

    Picks the tools

    The team's authoring software, IFC for exchange, Navisworks or IfcClash for clashes, a spreadsheet for quantities.

  5. Development

    Builds the routines

    Exports, tests and reports for each deliverable, with the rule written down.

  6. Review

    Checks with coordination

    Each deliverable is checked by the coordination team before it goes to the client.

  7. Release

    Delivers with your OK

    Files go where the contract says, only with your approval.

  8. Documentation

    Logs the delivery

    What was delivered, in which version, and who approved it.

Octo is not accountable for the contract. The deliverables belong to the contractor, and the client is the one who accepts them.

03

Each task, its own path.

The criteria Octo uses to choose. The tool your team already uses remains the reference.

Required usePathBasis
Clash detectionNavisworks Clash Detective or IfcClashDecree 10.306/2020, phase 1
Quantity takeoffReading the model with a scriptDecree 10.306/2020, phase 1
Drawing documentationBatch export in Revit or AutoCADDecree 10.306/2020, phase 1
Cost estimatingQuantities linked to SINAPI cost compositionsDecree 10.306/2020, phase 2
As-built modelLog of changes in the modelDecree 10.306/2020, phase 2
04

From request to routine.

Three steps. Each one only makes sense after the previous one has shown results on your team.

A proposal, not a promise

1 Today

Phase 1 deliverables

Clashes, quantities and drawing documentation, with written rules.

  • Clash tests by discipline
  • Quantities traced back to the model
  • Sheets in batch
Benefit: phase 1 deliverables follow the same rule
2 Next

Phase 2 deliverables

Cost estimate, planning and construction control linked to the model.

  • Quantities linked to the cost estimate
  • Schedule linked to the model
  • Log of changes on site
Benefit: the model keeps up with the project
3 Later

Getting ready for 2028

Phase 3 also covers projects of medium relevance and adds management and maintenance after construction.

  • Organized as-built model
  • Information ready for operations
Benefit: the final deliverable is useful to operators from day one
05

Confirmed by sources.

Every point below has a source published by the vendor, the project or the responsible agency. The sources are in the next section.

7

points with a published source, each with its reference alongside.

ConfirmedCurrent BIM BR Strategy
Decree 11.888/2024 sets out the National Strategy for the Dissemination of BIM in Brazil and, in article 14, revokes Decree 9.983/2019, the first version of the strategy.Source: Planalto, Decree 11.888/2024 and Decree 9.983/2019
ConfirmedDefinition of BIM
The decree defines BIM, or Building Information Modeling, as the integrated set of processes and technologies that makes it possible to create, use, update and share digital models of a building collaboratively.Source: Planalto, Decree 11.888/2024, art. 1
ConfirmedSteering Committee
The Ministry of Development, Industry, Trade and Services, through its Secretariat for Industrial Development, Innovation, Trade and Services, chairs the strategy's Steering Committee, and the same secretariat acts as its executive secretariat.Source: Planalto, Decree 11.888/2024, arts. 4 and 11
ConfirmedWho Decree 10.306/2020 binds
Article 2 covers the Ministry of Defense, for work on Army, Navy and Air Force properties, and the Ministry of Infrastructure, through the National Civil Aviation Secretariat, for investments in regional airports, and through DNIT, for strengthening and structural rehabilitation of special structures. Other federal agencies may adopt BIM under the terms of the decree. Each bound agency defines, by its own act, which projects are of medium and high relevance (art. 10).Source: Planalto, Decree 10.306/2020, arts. 2 and 10
ConfirmedPhase 1
Starting January 1, 2021, BIM must be used to develop architecture and engineering designs for new buildings, extensions or rehabilitations deemed highly relevant for spreading BIM, covering at least clash detection, quantity takeoff and drawing documentation.Source: Planalto, Decree 10.306/2020, art. 4, I
ConfirmedPhases 2 and 3
Starting January 1, 2024, also in design execution and construction management of highly relevant new buildings, renovations, extensions or rehabilitations, covering cost estimating, construction planning and control, and updating the as-built model. Starting January 1, 2028, for projects of medium or high relevance, also the management and maintenance of the facility after construction.Source: Planalto, Decree 10.306/2020, art. 4, II and III
ConfirmedLaw 14.133/2021
Article 19, V, provides for the gradual adoption of integrated digital-model technologies and processes for construction and engineering services. Paragraph 3 says that in bids for construction, engineering and architecture services, Building Information Modeling (BIM) shall preferably be adopted whenever it suits the scope.Source: Planalto, Law 14.133/2021
06

What Octo does and what stays with you.

Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.

Octo prepares

Surveys, calculates, organizes and produces the documents: spreadsheets, reports, drawing sheets and drafts.

Deliverable: material ready to check

Your team checks

The licensed professional checks what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.

Step: review by the signer

Who signs

Octo does not sign. Designs, technical reports, ART/RRT (Brazil's professional responsibility records), accountability reports and any official document are still signed by the company's or agency's licensed professional: here, the responsible engineer or architect, with an ART or RRT.

Sign-off: engineer or architect, with ART/RRT
07

Sources.

Federal legislation published on the Planalto website. Accessed on October 28, 2026.

If the bid calls for BIM, is your team ready?

The assessment starts with the bid notice and the models your team already has, without changing anything. You get a proposal for what can be automated in each deliverable and decide with it in hand.