Skip to content
Octo × Indicators PT Request an assessment

Octo for port indicators

The sector's numbers are public. Octo helps put them next to yours.

ANTAQ publishes the Estatístico Aquaviário, annually and semiannually, with data the yearbook attributes to the SDP, and maintains an open data portal. Porto sem Papel publishes BI dashboards. Octo can help your team download and organize this data and build an internal view alongside your operation's indicators.

The Estatístico Aquaviário, ANTAQ's open data and the internal indicators go into Octo, which returns a local database with the date of each load and a side-by-side report. INPUT ESTATÍSTICO AQUAVIÁRIO OPEN DATA INTERNAL INDICATORS LOCAL DATABASE WITH THE DATE REPORT SIDE BY SIDE download → organize → compare OCTO × PORTS INDICATORS GP-07
Estatístico Aquaviárioannual and semiannualpublished by ANTAQ
Data sourceSDPcited in the 2025 yearbook
BI dashboards2CONAPORTOS dashboard and PSP dashboard
Sources4listed at the end of the page
01

What Octo does with indicators.

Three possible deliverables. The official numbers are ANTAQ's; what Octo builds is your team's internal view.

Local database of the open data

Can download the datasets ANTAQ makes available in open format and build a local database, with the date of each load, for the team to query.

Deliverable: local database with the date of each load

Your numbers next to the sector's

Can build the report that puts internal indicators next to the published numbers, with the source of each.

Deliverable: comparative report for review

Periodic updates

Can schedule the database update for each new ANTAQ release, with a record of what changed.

Deliverable: update routine with a log
02

Eight arms, one dashboard.

The same Octo cycle, applied to this topic. Each arm has a narrow role; the people who approve and sign are on your team.

  1. Discovery

    Lists the indicators

    Which indicators your team tracks today and where each one comes from.

  2. Data

    Links the definitions

    Each internal indicator linked to the published data it can be compared with, with the definition on each side.

  3. Security

    Separates internal from public

    Internal numbers stay in the company's environment; only public data comes from outside.

  4. Architecture

    Picks the format

    Spreadsheet, database or dashboard, matching how the team already works.

  5. Development

    Builds the database

    Open data loads, the date of each load and the side-by-side report.

  6. Review

    Checks a known period

    Compares against a period the team has already analyzed.

  7. Release

    Delivers with your OK

    The report goes wherever the team says.

  8. Documentation

    Records the definitions

    What each indicator measures and where it comes from.

Octo does not publish official numbers. The official data is ANTAQ's; what Octo builds is your team's internal view.

03

Each dataset, its place.

Where the sector's public data lives. The official publication remains the reference.

DataWhereNote
Estatístico AquaviárioANTAQ publicationsAnnual and semiannual
Source of the yearbook dataSDP2025 Yearbook: “Source: ANTAQ - SDP”
Datasets in open formatANTAQ Open Data PortalData produced and held by the agency
Porto sem Papel dashboardsPSP pageCONAPORTOS dashboard and PSP dashboard
04

From request to routine.

Three steps. Each one only makes sense once the previous one has shown results on your team.

A proposal, not a promise

1 Today

Local database

Octo downloads and organizes the public data the team uses.

  • Database with the date of each load
  • Source of each number
Benefit: the public numbers are at hand
2 Next

Side-by-side report

Internal indicators are now seen next to the published ones.

  • Comparative report
  • Definitions on record
Benefit: the comparison has clear criteria
3 Later

Scheduled updates

The database updates with each new release.

  • Routine with a log
  • Notice of what changed
Benefit: the view doesn't go stale
05

Confirmed by source.

Each point below has a source published by the agency responsible for the standard or the system, or by the IMO. The sources are in the next section.

4

points with a published source, each with its reference alongside.

ConfirmedEstatístico Aquaviário
ANTAQ publishes the Estatístico Aquaviário in annual and semiannual editions, including the 2025 Estatístico Aquaviário presentation.Source: ANTAQ, waterway statistics
ConfirmedData source
ANTAQ's 2025 Yearbook gives “ANTAQ - SDP” as the data source.Source: ANTAQ, 2025 Yearbook
ConfirmedOpen data
ANTAQ's Open Data Portal compiles data produced and held by the agency in open format.Source: ANTAQ, open data
ConfirmedPSP dashboards
The Porto sem Papel page publishes BI dashboards: the CONAPORTOS dashboard and the PSP dashboard.Source: MPor, Porto sem Papel
06

What Octo does and what stays with you.

Octo prepares everything, but does not sign. The document of record stays with whoever is accountable for it.

Octo prepares

Gathers, calculates, organizes and produces the documents: spreadsheets, reports, dashboards and drafts.

Deliverable: material ready for review

Your team reviews

The licensed professional reviews what Octo delivered before signing. If something doesn't add up, it goes back to Octo with the correction.

Step: review by whoever signs

Who signs

Octo does not sign. Designs, technical reports, ART/RRT, accountability reports and any official document are still signed by the licensed professional at the company or agency: here, the professional of record and the port authority.

Signature: professional of record and port authority
07

Sources.

ANTAQ publications and open data and the Porto sem Papel page. Accessed October 28, 2026.

Your numbers next to the sector's.

The assessment starts with the indicators your team already tracks, without changing anything. You get a proposal for what can be compared and decide with it in hand.